Less than five months from start to finish!
St. Lawrence Cement in Mississauga awarded Bell-Camp the contract to fabricate the process ductwork for this project in July 2006. The required turnaround time of less than five months was a demanding challenge for a project consisting of over 165 tons of steel (before the ceramic lining)!
Because of the great organization at Bell-Camp, from our kick-off meeting, through to detailing and fabrication, we successfully met our customer's ship date requirements.
|
|
In true Bell-Camp fashion, the entire staff from administration through production and shipping, met the challenge head-on and contributed fully to its success!
Many of the loads that left Bell-Camp for the job site were private and/or police escorted due to the excessive size. We are proud to say that there have been no problems at the job site fitting these "monster" pieces together for installations.